1. YOUR DETAILS
Name:
Address:
and postcode
Promise:
We won't share your details with any other organisation.
Land line(s):
and mobile phone(s)
E-mail address:
(please enter only one address)
How did you find
out about us?
Google
Yellow Pages
Low Carbon Buildings Programme
Personal recommendation
Sign / van
Other
2. YOUR HOUSE
Please tick all boxes that apply
Your house is:
detached
semi-detached
terraced
a bungalow
2 storeys high
3 or more storeys high
How many bedrooms?
How many bathrooms
& shower rooms?
How many permanent occupants?
adult(s) teenager(s) child / children
Primary source of heat:
Oil
Natural gas
LPG
Wood
Coal
Other
Your house is:
an existing building, approximately years old
a new-build - please proceed to section 3
Is there an existing loft conversion ?
yes
Do you have plans for:
an extension
a loft conversion
If yes, when will the building work start (month / year)
Are you planning:
changes to the plumbing
a new cylinder
a new boiler
Please proceed to section 4
3. NEW BUILDS ONLY
Please fill in all fields that apply and send us your construction plans to the address at the bottom
The roof will go on:
(month / year)
The plumbing will be done in:
(month / year)
4. THE PROPOSED ROOF
Please tick all boxes that apply to roof you think would be best for solar panels
Roof covering:
slate
clay tile
concrete tile
stone
9" tile
Shading:
a lot of the day
part of the day
from tree
from a structure
none
Gradient:
steep
gentle
flat
No. of storeys below the roof:
one
two
three
Orientation of proposed location:
north-west
west
south-west
south
south-east
east
north-east
5. THE HEATING SYSTEM
Please tick all boxes that apply. This section is a bit technical. If you don't know the answers, don't tick any boxes and don't worry .
The system includes:
underfloor heating
a range cooker (e.g. AGA)
a heat pump
a wood boiler
other
The hot water cylinder is:
vented (un-pressurised)
un-vented (pressurised)
thermal store
none (I don't have a hot water cylinder)
approximately years old
located in:
an airing cupboard
a walk-in cupboard
other
situated:
on the ground floor
on the first / second floor
in the loft
in an outbuilding
Hot water is prepared by:
a normal boiler
a combi boiler
a system boiler
approximately years old
6. NEXT STEPS
The installation is required:
urgently
in the next 2-3 months
sometime soon, there is no rush
At this stage please provide:
technical advice and/or more information
an on-site technical survey and a no-obligation quotation
Preferred days and times for site survey
Thank you for completing our form. Click on the submit button to the left to deliver this survey to us by e-mail. Provided you have supplied a valid e-mail address, you will receive a confirmation e-mail.
Alternatively, print this form out and send it to us by post to:
Soltrac Ltd, St Mary's Cottage, Tisbury, SP3 6RE
If you have any difficulties or questions, please do give us a call on 01747 873003.