1.
YOUR DETAILS
Name
Telephone
Address
including Postcode
Promise:
We won't share your details
with any other organisation
E-mail
address
(please enter only one e-mail address)
How
did you hear about us?
2.
PROJECT BRIEF
Project
type
existing building
new-build or refurbishment, in the planning stage or partially
completed
Hot water demand
How
many persons live in your house permantently?
adults
children
Size & type of house
bedrooms
detached
semi-detached or terraced
bungalow
Other
Location
(optional)
Please go to Google
Maps , type your postcode into the search box,
zoom in to your house and move it into the centre of
the screen,
then click on
(top right) and copy/paste the link address here:
3.
SITE DETAILS
Proposed
orientation of solar thermal collectors
south
south-east
east
south-west
west
Potential shading
Is
there any shading from nearby trees, dormer windows,
chimneys or other objects?
Proposed mounting surface
onto a pitched roof covered with
tiles
slates
other
onto a flat roof
onto open ground
Other
Age of roof (if applicable)
years approximately
Planning permission
Is
the site a listed building or in a Conservation Area?
yes
no
Have
you already obtained planning permission (if applicable)?
yes
no
4.
PLUMBING
Hot
water heating
How
is your hot water predominantly heated?
with a gas or oil-fired boiler
with an electric immersion heater
with a range cooker and back boiler (e.g. Aga, Rayburn)
with a combi boiler or
electric shower
Other
Approximate
age of boiler
years
Hot water storage
Where
is your hot water stored?
in a vented cylinder with header
tank (e.g. in the loft)
in an unvented cylinder (usually white in appearance)
no hot water storage (e.g. combi boiler)
don't know
Other
Approximate age of cylinder
years
Layout of solar pipes
How far from the hot water store to the proposed solar
collectors?
Approximately
metres
feet
5.
ELECTRICS
Immersion
heater
Can your water be heated by an immersion heater?
yes
no
don't know
Consumer unit
What is inside your consumer unit (fuse board)?
old-fashioned fuses, e.g. wire-wound
modern circuit breakers (each
fuse has a switch)
RCD protection for
some circuits
RCD protection for all
circuits
don't know
General condition
When
was your consumer unit last upgraded or inspected by
a qualified electrician?
6.
NEXT STEPS
Time
scales
How
soon do you require our services?
urgently (e.g. other building
work is already under way)
within in the next 2-3 months
no rush
Our response
What would you like us to do?
send an estimate by e-mail
provide further information and advice on grants or
technical matters
arrange a site survey and issue a written quotation
Preferred
days and times for site survey
Click
on the 'Submit' button to send your information to us.
If
you have any difficulties or questions, please do give
us a call on 01747 873003.